{"id":1066,"date":"2020-07-22T11:22:25","date_gmt":"2020-07-22T04:22:25","guid":{"rendered":"http:\/\/bakumsu.or.id\/?p=1066"},"modified":"2020-07-22T11:22:25","modified_gmt":"2020-07-22T04:22:25","slug":"indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine","status":"publish","type":"post","link":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/","title":{"rendered":"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine"},"content":{"rendered":"<p>The International Finance Corporation\u2019s independent watchdog has accepted a formal complaint concerning a planned zinc mine in North Sumatra, Indonesia, that will create millions of cubic meters of toxic tailings in one of the world\u2019s highest earthquake risk zones. The watchdog, the Compliance Advisor Ombudsman, has accepted the complaint because an IFC client, Postal Savings Bank of China, loaned money to the mine\u2019s lead developer, in apparent contravention of the World Bank Group member\u2019s human rights and environmental standards.<\/p>\n<p>The mine\u2019s developer is Dairi Prima Minerals (DPM) which is now 51% owned by China Nonferrous Metal Industry\u2019s Foreign Engineering and Construction Co., Ltd. (NFC) and 49% owned by Indonesia\u2019s Bumi Resources Minerals.<\/p>\n<p>Residents of two villages near the mine filed the complaint in October, with the help of the U.S. organization Inclusive Development International and BAKUMSU, a legal rights organization based in Medan, the capital of North Sumatra. The communities are calling for the IFC and Postal Savings Bank to use their leverage to get proper information about the mine, which is in the early stages of development.<\/p>\n<p>\u201cWe were not consulted about this mine. We have not been told what this mine will be doing and what impacts it will have. \u201cAt very least, we want dialogue. We want to have proper information in front of us, and we want that information reviewed by international experts\u201d said Mr. Sugianto Hasugian, a resident of Bongakaras village involved in the complaint.<\/p>\n<p>\u201cIf we are going to be potentially living around or down from a potential disaster, we deserve to be consulted and informed. \u201cThis mine could produce millions of cubic meters of toxic waste. We want know what they will do with it. We know tailings dams leak and can collapse. We know the DPM mine is at the top of a stream system and we are down from it. We don\u2019t want to live under constant threat of tailings dam collapse\u201d said Ms. Rainim Purba, a resident of Pandiangan village involved in the complaint.<\/p>\n<p>\u201cDairi has a very high earthquake and flood risk. So why is this project being allowed?? Why are banks providing money to this company?? It is they who will be responsible for the disaster that may kill us in the future\u201d said Pak Mangatur Pardamean Lumbantoruan, a resident from Sumbari village involved in the complaint.<\/p>\n<p>&nbsp;<\/p>\n<p>\u201cWe are Batak Toba and Pak Pak people. We are farmers. We have been farming our land for generations. We produce crops that feed ourselves and support the wider economy. We do not want our lands and waterways poisoned. A mine is only for a short time, then leaves a huge mess. That is not the sort of development we want for our area\u201d said Ms. Rainim Purba, a resident of Pandiangan.<\/p>\n<p>YDPK, a local NGO working in the Parongil area, where the mine is proposed have been trying to assist the communities get information. \u201cWe have requested information from the Ministry of Minerals and Energy but they didn\u2019t provide it. We then requested the national information commission to access and provide information. They too have not done so\u201d said Diaconess Sarah Naibaho, Executive Director of YDPK.<\/p>\n<p>\u201cPeople are in the dark as to the possible impacts of this mine \u2013 and that in itself is an abuse of rights\u201d she said.<\/p>\n<p>Ridwan Samosir, Executive Director of PETRASA said \u201cWe too have been trying to support communities for sustainable agriculture &#8211; but the DPM mine potentially threatens that work we and communities have done.<\/p>\n<p>\u201cDPM and government are not being straightforward in providing information. We know the mine is in an area of high risk. Where is the waste management plan?\u201d he said.<\/p>\n<p>BAKUMSU, a legal aid organization based in Medan, the capital of North Sumatra, Medan have been asked to support the local communities. Manambus Pasaribu, the Executive Secretary, said \u201cwe have been doing a legal analysis if the mine. There are a number of issues. We think the mine may not fully comply with Indonesian laws\u201d.<\/p>\n<p>\u201cWe have seen letters between a Parongil resident and the Ministry of Environment and Forestry\u2019s AMDAL section saying that while DPM produced an AMDAL that was approved in 2005, they now need new environmental approval. In January 2019 DPM were informed of this. In March 2020 they still had not obtained new environmental approval\u201d.<\/p>\n<p>\u201cWe also know that the area is high disaster risk. Indonesian law says projects like mining in areas like this need to have risk analysis and risk management plans done\u201d. We have asked government for details on this but we cannot find any evidence to suggest the proper risk analysis has been done. We cannot find evidence that risk management plans have been done or approved\u201d.<\/p>\n<p>\u201cDPM have built an explosives storage facility within 50 meters of houses in a village. This seems in contravention to regulations. We know from media reports that China Nonferrous Metal Industry\u2019s Foreign Engineering and Construction Co., Ltd. (NFC) &#8211; which is now the majority shareholder and operator of the mine &#8211; had an explosion at a explosives storage facility in Zambia in 2005 that killed 46 people.\u201d<\/p>\n<p>Mr. Merah Johansyah, National Cooordinator of JATAM, a national network of NGOs and Community organization that concerns on human rights and environment issues in the mining and oil and gas industry group dedicated to minimizing the detrimental impacts of mining in Indonesia said: \u201cThe problem is that mines like this create a lot of toxic waste &#8211; especially where there are high levels of lead and other heavy metals \u2013 as is the case with the proposed DPM mine.\u201d He added, \u201cIndonesia does not have a solid regulatory framework nor the capacity to ensure mining disasters don\u2019t occur. Putting the DPM mine in such a high disaster risk area is just insane.<\/p>\n<p>\u201cAnyone putting money into this project should think again\u201d he said.<\/p>\n<p>\u201cNFC has been operating around the world. Huge environmental and human rights issues have been reported in countries like Zambia, Congo, Mongolia, Vietnam, Myanmar. Bumi resources has also been creating havoc with coal mining in Indonesia. What we have is a perfect storm of low regulation, companies with a poor track record, and a very high seismic and flood risk\u201d.<\/p>\n<p>\u201cThe communities have shown great courage in bringing this complaint in an effort to protect the environment and their way of life. The Compliance Advisor Ombudsman\u2019s acceptance of the complaint is an important step in avoiding that,\u201d said David Pred, Executive Director of Inclusive Development international, a US-based NGO that has been assisting communities and local NGOs with understanding the finance chain behind DPM and the international experiences of mining in high risk areas. \u201cWhat is being proposed is the creation of tailings storage facilities in an extremely unstable and risk prone area. People living downstream from the mine site will be forever living in fear of dam collapse and water contamination. Dam collapses in other areas of the world \u2013 even without such high earthquake risk \u2013 have destroyed villages, killed hundreds of people and poisoned the environment for generations.\u201d<\/p>\n<p>The IFC made a $300 million equity investment in Postal Savings Bank in 2015, after which the bank provided several lines of credit to China Nonferrous Metal Industry\u2019s Foreign Engineering and Construction Co., Ltd. (NFC) and its parent, the China Nonferrous Metals Mining Group. The IFC has increasingly outsourced billions of dollars to commercial banks around the world, which have gone on to finance nearly 150 socially and environmentally harmful <a href=\"https:\/\/airtable.com\/shrAA2T8L2SRtgX5M\/tbli4INbNgq79GsAL\/viw42dnWqRhYFIAGb?blocks=hide\">projects,<\/a> according to research led by Inclusive Development International.<\/p>\n<p>This is the first complaint involving a Chinese financial institution accepted by the Compliance Advisor Ombudsman. The complainants will have the option of pursuing dispute resolution with the parties or calling for an investigation of the IFC\u2019s compliance with its policies.<\/p>\n<p>The zinc mine is being developed by Dairi Prima Mineral, an Indonesian joint venture between the Beijing-based mining conglomerate China Nonferrous Metal Industry\u2019s Foreign Engineering and Construction Co., Ltd. (NFC) and Bumi Resources Minerals, a subsidiary of the Indonesian coal-mining giant Bumi Resources. The companies are seeking to build an underground mine to commercially extract zinc, lead and silver ore.<\/p>\n<p>The developers will likely construct a tailings facility near the mining site, where toxic waste will be stored. If not properly built and maintained, tailings ponds can fail, releasing toxic waste into the environment. In Brazil, two tailings dams collapsed in 2015 and 2019, releasing waves of toxic sludge that killed nearly 300 people.<\/p>\n<p>Inclusive Development International also commissioned a report on the seismic risks posed by the project. Dr. Richard Meehan of Stanford University concluded that the \u201cDairi Mine is located in one of the highest risk areas in the world.\u201d near the Sumatra subduction megathrust which produced in 2004 and 2005 earthquakes of magnitude 9 and 8+ respectively. The minesite is also only 15 kilometers from the Great Sumatra fault which produces long duration or repeated earthquakes, notorious for destroying civil structures like tailings dams. \u201cThis repetition or longevity of shaking can completely destroy structures including dams that would otherwise survive a short-duration quake with only partial collapse\u201d This, combined with the area\u2019s very heavy annual rainfall, led Dr. Meehan to predict that \u201cwithin a few decades after the \u2018closure\u2019 of the deposit, an earthquake-induced sudden failure of the tailings dam would send \u201ca wave of liquid mud downstream to the north.\u201d<\/p>\n<p>In 2005, Dairi Prima Mineral conducted an environmental impact assessment of the proposed mine. Since then, however, mine plans have changed and a significantly larger mine has been proposed. In 2019, DPM has been notified that it required new environmental approval. Despite that new approval not being granted, the mine proceeds with construction. Residents have expressed concern about potential dangers to animals and humans living near the mine. Local community members say they have not been appropriately consulted about the project. They fear the mine could pollute water sources, and harm soil and crops.<\/p>\n<p>On October 31, 2019, the Investor Mining and Tailings Safety Initiative announced that its 96 members, mostly institutional investors and pension funds, would consider divesting from mining firms that failed to disclose their tailings dams \u2013 and how they are mitigating risk at these facilities. Bumi Resources Minerals failed to respond to requests for disclosure.<\/p>\n<p>Besides the threat to land and livelihood, all the organizations concerned that Indonesians opposing destructive corporate projects have faced escalating violence. Three environmental human rights defenders have been killed in North Sumatra since October 2019.<\/p>\n<p>\u201cAs this case goes forward, the Indonesian government and the company must prioritize the safety and wellbeing of community members and the activists who support them,\u201d Pred said.<\/p>\n<p>\u201cThe citizens&#8217; complaints to CAO have also sent to the Chinese government so that the Chinese Ministry of Commerce can be aware of the complaint, and ask the Chinese institutions can address the concerns of the communities\u201d said Manambus Pasaribu. \u201cThey probably do not know the risks present in the local area, so we want to talk with them\u201d.<\/p>","protected":false},"excerpt":{"rendered":"<p>The International Finance Corporation\u2019s independent watchdog has accepted a formal complaint concerning a planned zinc mine in North Sumatra, Indonesia, that will create millions of cubic meters of toxic tailings in one of the world\u2019s highest earthquake risk zones. The watchdog, the Compliance Advisor Ombudsman, has accepted the complaint because an IFC client, Postal Savings&hellip;&nbsp;<a href=\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/\" rel=\"bookmark\">Read More &raquo;<span class=\"screen-reader-text\">Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":1067,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","footnotes":""},"categories":[4],"tags":[],"class_list":["post-1066","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pers-release"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine -\" \/>\n<meta property=\"og:description\" content=\"The International Finance Corporation\u2019s independent watchdog has accepted a formal complaint concerning a planned zinc mine in North Sumatra, Indonesia, that will create millions of cubic meters of toxic tailings in one of the world\u2019s highest earthquake risk zones. The watchdog, the Compliance Advisor Ombudsman, has accepted the complaint because an IFC client, Postal Savings&hellip;&nbsp;Read More &raquo;Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bakumsu\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-22T04:22:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@bakumsu_officia\" \/>\n<meta name=\"twitter:site\" content=\"@bakumsu_officia\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/#\/schema\/person\/366386b09cb9962eaaa24b3f95605fa6\"},\"headline\":\"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine\",\"datePublished\":\"2020-07-22T04:22:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/\"},\"wordCount\":1831,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg\",\"articleSection\":[\"PERS RELEASE\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/\",\"url\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/\",\"name\":\"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine -\",\"isPartOf\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg\",\"datePublished\":\"2020-07-22T04:22:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#primaryimage\",\"url\":\"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg\",\"contentUrl\":\"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg\",\"width\":1280,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/bakumsu.or.id\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/#website\",\"url\":\"https:\/\/bakumsu.or.id\/en\/\",\"name\":\"https:\/\/bakumsu.or.id\/\",\"description\":\"Perhimpunan  Bantuan Hukum dan Advokasi Rakyat Sumatera Utara\",\"publisher\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bakumsu.or.id\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/#organization\",\"name\":\"BAKUMSU\",\"url\":\"https:\/\/bakumsu.or.id\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/11\/cropped-cropped-LOGO-BAKUMSU2-1.png\",\"contentUrl\":\"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/11\/cropped-cropped-LOGO-BAKUMSU2-1.png\",\"width\":2905,\"height\":1082,\"caption\":\"BAKUMSU\"},\"image\":{\"@id\":\"https:\/\/bakumsu.or.id\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bakumsu\",\"https:\/\/x.com\/bakumsu_officia\",\"https:\/\/www.instagram.com\/bakumsu2000?igsh=Z3lzc2hoNmJ0Ynow\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/#\/schema\/person\/366386b09cb9962eaaa24b3f95605fa6\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/bakumsu.or.id\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/03551e5a9615c0d369f2e07878fdb63937cd06508a041783b1bf01e2f575d6c0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/03551e5a9615c0d369f2e07878fdb63937cd06508a041783b1bf01e2f575d6c0?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/","og_locale":"en_GB","og_type":"article","og_title":"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine -","og_description":"The International Finance Corporation\u2019s independent watchdog has accepted a formal complaint concerning a planned zinc mine in North Sumatra, Indonesia, that will create millions of cubic meters of toxic tailings in one of the world\u2019s highest earthquake risk zones. The watchdog, the Compliance Advisor Ombudsman, has accepted the complaint because an IFC client, Postal Savings&hellip;&nbsp;Read More &raquo;Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine","og_url":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/","article_publisher":"https:\/\/www.facebook.com\/bakumsu","article_published_time":"2020-07-22T04:22:25+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_creator":"@bakumsu_officia","twitter_site":"@bakumsu_officia","twitter_misc":{"Written by":"admin","Estimated reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#article","isPartOf":{"@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/"},"author":{"name":"admin","@id":"https:\/\/bakumsu.or.id\/en\/#\/schema\/person\/366386b09cb9962eaaa24b3f95605fa6"},"headline":"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine","datePublished":"2020-07-22T04:22:25+00:00","mainEntityOfPage":{"@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/"},"wordCount":1831,"commentCount":0,"publisher":{"@id":"https:\/\/bakumsu.or.id\/en\/#organization"},"image":{"@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#primaryimage"},"thumbnailUrl":"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg","articleSection":["PERS RELEASE"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/","url":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/","name":"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine -","isPartOf":{"@id":"https:\/\/bakumsu.or.id\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#primaryimage"},"image":{"@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#primaryimage"},"thumbnailUrl":"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg","datePublished":"2020-07-22T04:22:25+00:00","breadcrumb":{"@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#primaryimage","url":"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg","contentUrl":"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/07\/foto-aksi-HATAM.jpg","width":1280,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/bakumsu.or.id\/en\/indonesia-world-bank-watchdog-accepts-complaint-against-indonesian-mine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bakumsu.or.id\/"},{"@type":"ListItem","position":2,"name":"Indonesia: World Bank Watchdog Accepts Complaint Against Indonesian Mine"}]},{"@type":"WebSite","@id":"https:\/\/bakumsu.or.id\/en\/#website","url":"https:\/\/bakumsu.or.id\/en\/","name":"https:\/\/bakumsu.or.id\/","description":"Perhimpunan  Bantuan Hukum dan Advokasi Rakyat Sumatera Utara","publisher":{"@id":"https:\/\/bakumsu.or.id\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bakumsu.or.id\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/bakumsu.or.id\/en\/#organization","name":"BAKUMSU","url":"https:\/\/bakumsu.or.id\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/bakumsu.or.id\/en\/#\/schema\/logo\/image\/","url":"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/11\/cropped-cropped-LOGO-BAKUMSU2-1.png","contentUrl":"https:\/\/bakumsu.or.id\/wp-content\/uploads\/2020\/11\/cropped-cropped-LOGO-BAKUMSU2-1.png","width":2905,"height":1082,"caption":"BAKUMSU"},"image":{"@id":"https:\/\/bakumsu.or.id\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bakumsu","https:\/\/x.com\/bakumsu_officia","https:\/\/www.instagram.com\/bakumsu2000?igsh=Z3lzc2hoNmJ0Ynow"]},{"@type":"Person","@id":"https:\/\/bakumsu.or.id\/en\/#\/schema\/person\/366386b09cb9962eaaa24b3f95605fa6","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/bakumsu.or.id\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/03551e5a9615c0d369f2e07878fdb63937cd06508a041783b1bf01e2f575d6c0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/03551e5a9615c0d369f2e07878fdb63937cd06508a041783b1bf01e2f575d6c0?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/posts\/1066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/comments?post=1066"}],"version-history":[{"count":1,"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/posts\/1066\/revisions"}],"predecessor-version":[{"id":1068,"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/posts\/1066\/revisions\/1068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/media\/1067"}],"wp:attachment":[{"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/media?parent=1066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/categories?post=1066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bakumsu.or.id\/en\/wp-json\/wp\/v2\/tags?post=1066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}